
Padel Perimeter Linear System
- 2.596 kW reference system
- 175 lm/W nominal
- DALI Bluetooth
Real product images and technical information from the supplied datasheets. Sign in to view the price assigned to your professional account.







Final configuration, certificates and photometry are confirmed with each quotation.

A continuous low-glare linear lighting concept engineered around the full perimeter of a standard padel court.
Technical note. Reference targets include GR <22 and U₀ 0.82. Final glare, uniformity and illuminance must be verified by a project-specific DIALux calculation.
Request quotation →
One adaptable high-bay platform with field-selectable power, colour temperature and beam angle.

High-output linear luminaire with selectable power, DALI-2 control and wide asymmetric performance for demanding spaces.
Technical note. Photometric values shown are based on the supplied 320 W test configuration.
Request quotation →
A compact two-module linear platform designed for efficient industrial lighting and straightforward project integration.
Technical note. Protection rating, input voltage, dimensions and warranty are confirmed against the selected production configuration before quotation.
Request quotation →
A broad wattage family for flexible outdoor specification, with selectable colour temperature and robust wet-location protection.
Technical note. Output and dimensions vary by wattage. Final performance is confirmed for the selected model.
Request quotation →
A slim ceiling luminaire combining adjustable white light with a dedicated warm night-light mode and wireless control.

A round or square ultra-slim panel with adjustable power and CCT, optional microwave sensing, and flexible surface or recessed installation.
Technical note. Sensor, power and mounting configurations vary by model. Final specification is confirmed for the selected project version.
Request quotation →Product images are extracted from the supplied technical documents and show the referenced product family. Specifications remain subject to final configuration, compliance review and project confirmation.